Time to Fill: The Formula, How It Differs from Time to Hire, and Where the Days Go

Time to fill is the number of calendar days a job stays open, counted from the day the requisition is approved to the day a candidate accepts the offer. It measures the job's clock. Time-to-hire measures the candidate's clock, from the day a person enters the pipeline to the day they accept, and it starts weeks later. Operations cares about the first number, because that is how long the shift goes uncovered. Recruiting usually reports the second, because it is shorter.

The Formula

Time to fill = days from requisition approved to offer accepted, reported across the requisitions you closed in the period.

The arithmetic is the easy part. The endpoints are where the metric falls apart. Three dates get used for the start: requisition approved, requisition posted, first application received. Two get used for the end: offer accepted, first day worked. That is six defensible combinations, and the gap between the widest and the narrowest is routinely three weeks. A published figure of 44 days and an internal figure of 21 can describe the same process.

So pick one pair of endpoints, write them in the definition that sits next to the number, and refuse to compare against any benchmark that does not state its own. For hourly hiring, start at requisition approved and stop at offer accepted, then track offer accepted to first shift worked as a separate number. That second gap is where first-day no-shows live, and folding it into one metric hides them.

Where the 28 Days Go

A senior living operator with nine buildings approves a CNA opening on a Monday. Here is the requisition that filled fastest last quarter, broken into intervals.

IntervalDaysWho owns it
Requisition approved to posting live4HR, plus the manager's edits to the job description
Posting live to a usable applicant pool3The wage, the posting, the channels
Applications waiting in the queue for a first round11Recruiting
First round done to on-site interview held7The scheduler and the director of nursing's calendar
Interview to offer accepted3The hiring manager

Twenty-eight days, and one block is larger than any two others combined. That block is not work. It is a queue. Sixty applications arrived, one scheduler places calls between 9 and 5, and the applicants are on someone else's floor from 7 to 3 and cannot pick up. Two attempts each with a day in between, and the pool ages while it waits. The strongest applicants take the job down the road around day four, which is candidate drop-off you are paying for in calendar days.

Compressing that block compresses the whole number, because nothing downstream can start until it clears. Compressing the three-day offer decision wins you three days at most, and the hiring manager will not give them up.

Days Open Have a Price

Put a rate on the days and the metric stops being an HR report line. A 3-to-11 CNA line at a $22 base, covered by overtime at time and a half, costs an extra $11 an hour, or $88 a shift. Hold that opening 28 days and the uncovered line costs roughly $2,400 in premium pay. Cover it with agency at $38 an hour instead and the gap is $128 a shift, about $3,500 over the same 28 days. One opening, one building.

None of that appears in cost per hire, which counts the spend required to produce the hire, not the loss while the seat was empty. The throughput view across every open requisition at once is hiring velocity.

The Average Is the Wrong Statistic

Fourteen caregiver and CNA requisitions closed last quarter. Twelve filled between 12 and 26 days. One took 71. One took 96. The mean is 31 days and the median is 19.

Report the mean and your COO plans staffing around a month per opening, which is wrong for twelve of the fourteen. Report the median plus the tail, as in "19 days typical, and two of fourteen ran past ten weeks, both at the same building," and you have handed operations a specific place to look. The useful pair is the median and the share of requisitions filled inside your target window.

Then count the requisitions that never closed. Averaging only filled requisitions is survivorship bias with a dashboard attached: the hardest openings are the ones still open, and they are absent from the number by construction. Publish time to fill for closed requisitions next to requisition aging for open ones, meaning how many are open today and how old the oldest is. A team can post a clean 19-day median while three overnight positions have sat open since spring.

There Is No Usable Hourly Benchmark

The averages that circulate, 30 days, 36 days, 44 days, come from surveys that mix salaried and hourly roles, use different endpoints, and are self-reported by the teams being graded. A caregiver opening in a county with three competing operators and a corporate analyst role share nothing except the word requisition.

Compare yourself to yourself. Building against building on the same wage and role, this quarter against last, one source against another. For the labor-market context behind a requisition that will not fill, the Bureau of Labor Statistics Job Openings and Labor Turnover Survey publishes openings and quits by industry every month, and health care and social assistance plus accommodation and food services carry the highest churn. That is why the same requisitions keep reopening.

What Screening Cannot Compress

A faster first round does nothing to four of the five intervals above, or to any of this:

  • The approval lag before the requisition is real
  • Background checks, drug screens, and license verification, which run on a vendor's or a state's clock
  • Your hiring manager's interview availability
  • The gap between an accepted offer and the next orientation class, which in senior living and trucking is often the longest interval in the entire process

If your 28 days is 4 of posting, 2 of screening, 7 of interview scheduling, and 15 waiting for the next orientation cohort, screening software will sell you two days. Measure the intervals before you buy anything, including this.

Where Prelim Fits

Prelim compresses one interval: the queue in front of the first round. Paste the job description you already posted, the AI drafts role-specific screening questions, you edit them to ask for dates, shifts, and numbers, and you share one link. Candidates answer in writing in any phone browser, with no app, no account, no camera, and no appointment, so the screen happens at 10 p.m. after a shift instead of waiting for a callback window. You get scored and ranked results with full transcripts, so the first round stops being a phone queue and becomes a batch you read in one sitting. The link embeds at the end of your application, on a career page, in a job posting, or inside your ATS, with integrations for Ashby and Zoho Recruit, an API, and an MCP server. Free to start.

In interval terms, that moves 11 days to about two. It leaves the other 17 exactly where they were. The mechanics are in asynchronous screening.

Key Takeaways

Time to fill runs from requisition approved to offer accepted, and it only means something when both endpoints are written beside the number. Keep it apart from time-to-hire, since one is the job's clock and the other is the candidate's. Break it into intervals before trying to improve it, because the block where applications wait for a first round is usually the largest and is a queue rather than work. Price the days in overtime or agency cover so the number has a dollar figure attached. Report the median and the tail, show requisition aging for everything still open, and compare your own locations instead of a benchmark that will not state its definition. Where to start: senior living hiring, warehouse hiring, high-volume hiring, the warehouse associate screen, the CDL driver screen, and how AI screening cuts time-to-hire.

Try AI-powered screening interviews

Screen candidates in minutes with structured scoring and instant results.

Start free